Site Manager Portal
Enter your PIN to continue
Incorrect PIN — try again
1
 
2
ABC
3
DEF
4
GHI
5
JKL
6
MNO
7
PQRS
8
TUV
9
WXYZ
0
 
 
Change PIN
Enter your current PIN, then set a new 4-digit PIN.

Site Manager Portal

Aveling Homes

📋
Stage Checklists
18 stages · Single storey construction
🦺
Site Safety Inspection
Form 10-01 · 21 safety items
🔍
Inspector Report
Upload and analyse WA building inspection reports
Smart Tools
Defect write-ups · photo analysis · email drafts
📁
Completed Log
All saved submissions
Stage Checklists

Single Storey

All Stages

Select a stage to begin
Setup
Acquiring GPS...Checking your location
🌤️
—°C
Site weather
Feels
Wind
Rain
UV
Inspection
Items completed0 / 0
Site Manager Sign-Off
I confirm all items have been inspected in accordance with Aveling Homes specifications, plans and addenda.
Site Safety Inspection
Form 10-01 Rev.5 · Ensure construction works do not impact members of the public. Sites to be kept clean. Equipment, materials and rubbish must not block roads or footpaths. No unauthorised persons on site.
Safety Inspection
Items completed0 / 21
Comments
Recommendations / Actions Required to Comply
Site Manager Sign-Off
I confirm this safety inspection has been completed in accordance with Aveling Homes safety requirements.
Completed Log
Complete Safety Inspection
Finalise this safety inspection record.
Generating PDF
Building report...
Inspector Report

Inspector Report

Upload & analyse building reports

Job Details
Upload Report
📄
Upload PDF Report
Tap to select a PDF or image file from your device
— or capture with camera —
📷Take Photo
🖼️Choose from Library
AI Service
✓  AI service connected
The AI analysis runs through a secure Aveling Homes server. No setup required on this device.
About AI analysis
AI is used to help with inspector report review, defect write-ups, photo analysis and trade emails. The API key is managed centrally for all Aveling site managers — you don't need to enter anything here.
Analysis Results
Analysing Report
📤Sending report to AI...
🔍Reading findings...
⚖️Assessing risk levels...
Preparing results...
Smart Tools

Smart Tools

Helpers for the Site

Choose a tool
📝
Defect Write-up
Rough notes → professional defect description, NCC clause and P1–P4 priority
🔬
Photo Analysis
Snap a photo — AI flags potential defects (efflorescence, flashing, cracks, mortar issues)
🔧
Trade Rework Email
Firm but professional email to a trade requesting rectification of defects
Photo Analysis
Take or upload a photo of work on site. AI will flag potential issues against WA standards. Not a substitute for qualified inspection.
📷Take Photo
🖼️Upload
Email Drafter
Defect Write-up
Rough notes → professional description
Rough notes / voice description
Photo